September 3, 2024 In Unkategorisiert
Castellum To Install A Further 100 Solar PV Systems By 2030
Back at the start of 2024 Castellum reached its target of installing at least 100 PV systems as part of its solar panel program “100 on Solar” by the end of 2025. This solar power initiative will now continue, with the installation of a further 100 PV systems by 2030.
No Comments