Juni 22, 2024 In Unkategorisiert
First wind turbine put in at Borkum Riffgrund 3
The first wind turbine has been installed at the German offshore wind farm Borkum Riffgrund 3, which is jointly owned by Ørsted and Nuveen Infrastructure.
The first wind turbine has been installed at the German offshore wind farm Borkum Riffgrund 3, which is jointly owned by Ørsted and Nuveen Infrastructure.
No Comments